2020 Pavement Management, Phase 39, HMA Overlays & Base Repair

The City of Alameda Public Works Department is soliciting bids for the 2020 Pavement Management, Phase 39, HMA Overlays & Base Repair, P.W. No. 05-20-26.

The work to be done consists of furnishing all labor, tools, equipment, materials, except as herein specified, and doing all work associated with routine maintenance and repair work on public streets in the City of Alameda, depending upon funding available and bid results. Work will include removal and replacement of select portions of pavement. The full width of each street will then be resurfaced with asphalt concrete.  New detectable warnings (truncated domes) will be added to all curb ramps that lack them at present, in accordance with the Americans with Disabilities Act Accessibility Guidelines.

There is NO prebid meeting.

Bids must be presented to the Public Works Department, 950 W. Mall Square, Room 110, Alameda, California, under sealed cover, plainly marked on the outside, "2020 Pavement Management, Phase 39, HMA Overlays & Base Repair, P.W. No. 05-20-26”, not later than 2:00 p.m. on June 10, 2020The Bid opening time is 2:01 p.m.

The Notice to Proceed for this project is scheduled to be issued in early August 2020.

For questions or additional information, contact Trung Nguyen, Project Manager I, at (510) 747-7930 or tnguyen@alamedaca.gov and msanchez@alamedaca.gov.

VIEW / DOWNLOAD THE PROJECT DOCUMENTS
The plans and specification for this project have been put into four (4) separate PDF's for ease of opening and downloading information as follows:

1.  Specification and Exhibits(PDF, 3MB)
(PDF, 3MB)
2.  State of California Standard Plans(PDF, 620KB)
3.  Additional Red Curb Painting(PDF, 650KB)
4.  Project Plans(PDF, 7MB)

VIEW / DOWNLOAD ADDENDUM NO. 1(PDF, 211KB) , Issued May 26, 2020

VIEW / DOWNLOAD ADDENDUM NO. 2(PDF, 2MB) , Issued June 3, 2020

VIEW / DOWNLOAD BID RESULTS(PDF, 73KB)