The City of Alameda (“City”) will accept sealed bids for its Annual Paving Project Phase 44 Project (“Project”), by or before June 3, 2026 at 2:00 p.m. at the City’s Public Works Office, located at 950 West Mall Square, Suite 110, Alameda, CA 94501at which time the bids will be publicly opened. No bids will be accepted unless submitted on the Bid Proposal and Schedule form provided in the Project Manual.
The Project includes, but is not limited to, performing the following Work:
Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with but is not limited to mobilizing, traffic and pedestrian control to manage and close off work areas from pedestrians, cyclists, motor vehicles, and parking, clearing and grubbing, tree protection, milling and removal of existing asphalt concrete pavement, removal of existing concrete including curb, curb and gutter, sidewalk, and curb ramps, removal, stockpiling and disposal of base and/or subgrade materials, adjusting utility covers, new sidewalk, curb, curb and gutter, curb ramps, concrete swale, subgrade preparation (with over-excavation as needed), excavation, slurry seal, asphalt rubber chip seal, microsurfacing, crack sealing, installation of rectangular rapid flashing beacons (RRFB), K- 71 bollards, striping and signage, painted curb.
This Project is situated on the following City streets:
Morton Street, Encinal Avenue to Pacific Avenue
Benton Street, Encinal Avenue to Buena Vista Avenue
Cottage Street, Central Avenue to Santa Clara Avenue
Paru Street, San Antonio Avenue to Santa Clara Avenue
Paru Street, Lincoln Avenue to Buena Vista Avenue
Fernside Boulevard, Versailles Avenue to High Street
Toyon Terrace, Post Street to end
Approximate cost of construction: $1.89 million
There will be no prebid meeting for this Project.
The Contractor shall begin Work no later than five working days following the start date specified in the Notice to Proceed, which may be hand delivered or sent by email. The Contractor shall complete all Work on the Project within 50 Working days after the above start date.
The Contractor, and all Subcontractors, shall pay all workers not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations (“DIR”), State of California, for the Work performed, pursuant to sections 1770 et seq. of the California Labor Code. Copies of the general prevailing rates of per diem wages for each craft, classification, or type of worker needed to execute the Contract, as determined by the DIR, are on file at the City. Prevailing wage rates are also available online at: http://www. dir.ca.gov. This contract shall also be subject to a Project Stabilization Agreement between the City and Building and Construction Trades Council of Alameda County, a copy of which has been included in the project manual.
Each Contractor and Subcontractor must pay no less than the specified rates to all workers employed to work on the Project. The schedule of per diem wages is based upon a working day of eight (8) hours. The rate for holiday and overtime work shall be at least time and one-half.
Pursuant to Public Contract Code (“PCC”) section 4104, no contractor or subcontractor shall be qualified to bid on, or be listed in a bid proposal unless currently registered to perform public work pursuant to Section 1725.5.
No bids will be accepted from a Contractor who has not been licensed in accordance with Business and Professions Code section 7000 and following. The General Contractor shall possess a valid Class A construction license issued by the California Contractors State License Board for this Project.
Printed or electronic copies of the plans, specifications, and contract documents, including the Project Manual, and/or any issued addenda may be obtained from BPX Printing & Graphics located at 4903 Central Avenue, Richmond, CA 94804 for a non-refundable cost of $125 per set, exclusive of shipping and handling. Copies of the documents may be viewed and ordered at https://www.alamedaplanroom.com/ or by contacting BPX at (510) 559-8299 or at Richmond@bpxprinting.com. Please contact BPX for ordering or downloading questions. To ensure receipt of any subsequent communications (e.g., an Addenda), each prospective bidder is responsible for confirming that their firm appears on the BPX plan holders’ list.
Bidders are responsible for obtaining any and all changes to the plans, specifications, proposal forms, addenda, other project notifications, and documents during the bid process. A bid is invalid if the Bidder has not deposited it at the designated location prior to the time and date for receipt of bids indicated in this Notice Inviting Bids or prior to any addendum extension thereof.
The City reserves the right to reject any or all bids; to waive minor defects or technicalities; or to solicit new bids. As per PCC section 20170, all bids shall be submitted under seal and accompanied by cash, a bidder’s bond executed by an admitted surety insurer, a cashier’s check, or certified check payable to the City of Alameda in an amount equal to 10% of the total amount bid (PCC 20171).
Upon award of the contract, the successful Bidder shall furnish a bond for faithful performance in the amount of 100% of the total bid. The successful Bidder shall also furnish a bond to secure the payment of all claims for labor and material in the amount of 100% of the total bid. Further, the successful Bidder, and all subcontractors, shall pay for and obtain a City of Alameda Business License.
Retention: The Contractor may elect to receive 100% of payments due under the contract from time to time, without the City retaining any portion of the payment, by depositing securities of equivalent value with the City or in an escrow agent pursuant to PCC section 22300. Such securities, if deposited by the Contractor, shall be valued by the City’s Risk Manager whose decision on valuation of the securities shall be final.
The Contractor’s attention is called to the Business and Professions Code section 7108.5, which generally requires subcontractors to be paid not later than seven days after receipt of each progress payment.
Please direct any Project questions in writing to Ali Hatefi (ahatefi@alamedaca.gov) by Tuesday May 26 at 12:00 p.m.