opens in new tab or window
Skip to main content
Quick Links
Facebook
Instagram
English (United States)
Select this as your preferred language
Select a language to translate to
English (United States)
Select this as your preferred language
Open
Search
Menu
Residents
Information for Residents
New Resident Guide
Who to call when you need help
Permit Center
Prepare Our Island
Airport Noise
Estuary Bridges
Alameda CARE Team
Be Alameda Ready
Subscribe
Get Around Alameda
City Tobacco Ordinances
Alerts & Advisories
Alameda 4th of July Parade
Auto Parking in Alameda
Park and Webster Street Area Parking
Parking Citations and Enforcement
Auto Parking FAQs
Ferry Terminal & Transit Parking
Curb Management Policy and Planning
Island Hopper: Alameda Point's Free Weekend Shuttle
City of Alameda Guaranteed Income Pilot Program
Making Alameda Accessible (ADA)
Visit Alameda
Events
Attractions
Travel Around Alameda
New Resident Guide
Accommodations
July 4th Parade - Classic & Convertible Cars & Drivers Needed!
Business
Starting a Business in Alameda
Business Licensing & Permits
Programs and Information
Local Campaigns 2025
Facade Grant Program
At Your Service
Business News from the Island
Market Information
Business Associations & Improvement Areas
Leasing City-Owned Properties
Employment Resources
Resources for Employers
Resources For Job-Seekers
Business Registration for 10th Annual Job Fair
Bid on City Contracts
Notice of Funding Availability & Request for Proposals
Request for Proposals for Cultural Art and Arts Programming
Pavement Management Project Phase 42
Invitation to Bid Alameda Point Building 116 Demolition Project
RFP On Call Residential Roof Repair, Maintenance, and Replacement
RFP On Call Fire Alarm Inspection and Monitoring Services
RFP On Call Maintenance and Inspection Services for Fire Sprinkler Sys
RFP Alameda Point Security Patrol
Alameda Point Building 17 Board Up Project BRED No. 2025-07
Request for Proposal: Grand Marina Wharf Maintenance
Request for Proposal: Commercial Real Estate Broker(s)
Alameda Day Center Project HHS No. 25-01
2026 Residential Property Management RFP
RFP For Waste & Hazardous Waste Removal & Disposal Services
HOME Investment Partnership Program Housing Development RFP
Residential Rehabilitation Program Administrator RFP
Geographic Information System (GIS)
City of Alameda Citywide Viewer
Your Government
Elected Officials
Mayor Marilyn Ezzy Ashcraft
Vice Mayor Michele Pryor
Councilmember Tony Daysog
Councilmember Greg Boller
Councilmember Tracy Jensen
City Auditor, Kevin R. Kearney, CPA
City Treasurer, Kevin Kennedy
City Council Priorities
City Departments
Strategic Plan
Key Documents
Boards & Commissions
Applications, Appointments and Vacancies
Civil Service Board
Commission on Persons With Disabilities
Historical Advisory Board
Housing Authority Board of Commissioners
Planning Board
Public Art Commission
Online Application: Boards/Commissions
Meeting Agendas, Minutes & Videos
City News
Sister Cities
Coast Guard City
Public Comment and City Council Meeting Information
State of the City
Alameda In The News
Proclamations 2026
CITYWIDE PROJECTS
Programs and Services Addressing Homelessness
Warming Shelter
Homelessness Strategic Plan
Point-In-Time Count
Traffic Safety and Transportation
Heritage Months
Converting City Halls to drought-tolerant landscape
City Aquatic Center
De-Pave Park
Making Alameda Accessible (ADA)
Zero Waste Implementation Plan Update
Stronger Together
Search
HOME
/
Planning • Building • Transportation
/
Permit Center
/
Per the Building Official & Code Interpretations
Per the Building Official & Code Interpretations
Mechanical
AC Condenser Setbacks:
The City of Alameda has no setback requirements. Follow the manufacturer's instructions. Do not block the only 3’ egress path from the rear yard to the front right-of-way. See our AC handout for more details.
Crawl Space Furnace:
A new furnace in a crawl space or basement with < 2 x 10” joists require ½” gypsum board on the underside of the crawl space floor joists for the entire home.
Per the Building Official
, only the footprint of the room above the furnace is required to be rocked. Like for like in the same location is exempt. Gypsum board must be moisture resistant or painted. CRC 302.13
Mini-Split Disconnect:
An electrical disconnect or listed cord and plug for interior units shall be provided within sight of the unit or using lockable disconnect at power source when not within sight to comply with CEC 110.25 & 440.14 & CMC 903.2.7
Ventless Dryers:
Code requires a 4” duct to be installed with a ventless dryer. We do not enforce this code requirement.
Plumbing
Fixture Counts:
Alameda will only use CPC 4-1 to calculate fixture counts. We will not be using the CBC as detailed in CPC 422.1.
EQ Valves:
Required to be installed with all gas line modifications. See our EQ valve handout for more details.
Below Ground Copper Piping:
Copper piping is not allowed under slabs with a building above (sleeved is acceptable). Alameda has wet acidic soil that eats through copper pipes.
Plumbing Fixtures:
The code requires all plumbing fixtures to be upgraded to the current flow rate requirements even if those fixtures are not modified.
Example:
remodel one bathroom, code requires all bathrooms, kitchen, and laundry fixtures to be brought to the current code. This is not enforced in Alameda. Only the bathroom being remodeled is required to be code compliant.
Water Heaters:
See water heater handout for special allowances regarding temperature and pressure relief valves that cannot gravity drain to the exterior.
Electrical
Romex:
Non-Metallic Sheathed Cable must be protected in crawl spaces ≥ 36” tall, garages and utility rooms. Romex cannot be subject to physical damage. CEC 334
Services:
Residential service panels must be EUSERC compliant. See our Electrical Service Requirements handout for all service-related requirements. AMP requirement
Services:
No LBs or gutters between the panel & the weather-head. AMP requirement
Services:
No gate between the street & the meter. AMP requirement
Services:
The water main bond is required to be outside and accessible – if possible. AMP requirement
Service Meter Height:
AMP requirement
48-66”
72-75” on driveway
Battery Storage Systems:
Requires AMP inspection prior to building inspection. This is to verify the battery system is not backfeeding the grid. See our ESS handout for more details. AMP requirement
Egress Lighting:
Track lighting or other easily removable lighting fixtures cannot be used for emergency egress lighting.
Subpanels:
You can add circuits to an existing non-compliant panel (in a closet) without moving the panel to a compliant location. Swapping out the panel requires code compliance. New circuits may require AFCI compliance.
Subpanels:
You can move a panel out of a closet to the same general area without upgrading the entire house to current AFCI code.
Knob & Tube:
K&T cannot be extended. You are allowed to repair or reenergize existing wiring.
Kitchen Upgrades
AFCI:
AFCI protection is only required with new or modified circuits. The Building Official has deemed “
modification of a circuit
” as modification to the conductors.
You can replace cabinets without a permit, like for like.
You can replace countertops without a permit, like for like.
You can replace a dishwasher, disposer, sink, range, oven, hood, and refrigerator without a permit (without modification to the electrical, plumbing and mechanical systems and returned to the same location).
All new or modified circuits are required to conform to the current code.
Removal of Sheetrock (kitchen gut) requires a permit, and complete electrical upgrade to the current code.
Kitchen Sink Drain:
An existing 1.5” drain line can remain if it is not modified.
See our kitchen handout for more details.
Bathroom Upgrades
Curbless Shower:
The shower pan liner must extend ≥ 2’ into the bathroom (splash zone).
Shower Drain:
The existing 1.5” shower waste can remain if the drain line is inaccessible. Replace the fouling chamber with a 2” line, the 1.5” trap must remain, so a plumber knows which size snake to use when clearing an obstruction.
Bathroom Remodel:
A bathroom fan is not required to be added during a remodel unless a plumbing fixture is added.
20-amp Receptacle:
If the wall is opened ≤ 3’ from the bathroom sink, or, if the conductors are modified, then the bathroom electrical circuit will have to be brought to the current code.
20-amp Receptacle:
Upgrading the circuit is not required when replacing a like-for-like fan or light fixture.
Tempered Glazing:
Aftermarket film is not a substitute for tempered glazing. With a like-for-like bathroom remodel, the existing non-safety glazing can remain. Window replacement requires compliance with the current code.
See our bathroom handout for more details.
General
Egress Bedroom Windows:
Emergency escape and rescue openings (see windows handout) R310
Constructed < 1964:
≥ 3.3 sq. ft.
18” x 18”
48” to sill
1964-1969:
≥ 5 sq. ft.
24” min width/height
48” to sill
1970-1975:
≥ 5 sq. ft.
22” min width/height
48” to sill
1976-present:
≥ 5.7 sq. ft.
20x24” min width/height
44” to sill CRC R310.2.1
New Construction/Additions Adjacent to Property Lines:
Homeowners and their agents are solely responsible for representing property line setbacks accurately on the Site Plan. For all new proposed detached habitable space (R-3 occupancies), a survey from a CA-licensed surveyor / civil engineer must be made available to the building inspector when constructing <4' from a property line (reducible to <3' when NO door or window openings face the property line). The survey must explicitly designate discernable reference markers for field measurements. In addition,
the surveyor must provide a form certification letter confirming foundation form setbacks relative to property lines PRIOR to a foundation inspection
.
Property Line Survey Req (R-3 Occupancies – New Detached Dwellings)
≥ 5 feet from the property line
Fire-rated assembly not required.
Openings allowed without restrictions.
Survey not required.
≥ 4 & < 5 feet from the property line
1-hour fire-rated assembly required.
Openings allowed (25%).
Survey not required.
≥ 3 to & < 4 feet from the property line
1-hour fire-rated assembly required.
Openings allowed (25%).
Survey required for openings.
Survey not required if no openings.
< 3 feet from the property line
1-hour fire-rated assembly required.
Openings not allowed.
Survey required to verify building placement relative to the property line.
Smoke Detectors:
All smoke detectors are now required to be interconnected regardless of the scope of the remodel. This is not enforced in Alameda. See our smoke detector handout for more details.
Permit Expiration:
Building permits are good for 1 year. The 1-year time period resets after every “
Approved or Partial Approval
” inspection.
Pergolas and Gazebos:
Permits required if > 120 sq. ft.
Exterior Landscaping Stairs:
Permits are not required for exterior landscaping stairs that do not service the building and are not part of the required egress path from the rear yard to a public right of way.
Revised: March 20, 2024
Back to top
Street Sweeping Scheduled
To help keep our streets clean from debris and safe for all modes of travel, the City will resume street sweeping service according to posted schedules this Monday, June 15, 2020.
Public Works Department
Announcement
equals