Gibbons Dr/High St/Fernside Blvd Safety Updates

Thank you to all who participated in the community open house and virtual workshop! The online survey will be open until midnight on Sunday, October 5. After that, the project team will compile public feedback and prepare recommendations for the Transportation Commission to consider endorsing on October 22. Join us! 

Read about the project:
Share your input:

Take the survey by 10/5

The Gibbons/High/Fernside Intersection Safety Updates project is considering design concept alternatives to improve safety at this intersection while balancing the needs of nearby local streets. 

While working on Fernside Blvd Traffic Calming & Bikeways Project, the project team recognized a need for safety improvements and operational updates at the Fernside Blvd/High St/Gibbons Dr intersection. In November 2024, the City sought feedback on proposed intersection updates that would simplify this challenging intersection, including a partial limitation of traffic movements between Gibbons Dr and High St. In March 2025, the City Council directed staff to return to City Council after conducting the planned traffic study evaluating this concept. The City contracted with consultants to gather traffic data in late spring and complete the traffic study over the summer. Starting the week of September 22, 2025, the City will seek public input regarding design and phasing options for the Gibbons Dr/High St/Fernside Blvd intersection, based on traffic study findings. 

Community Workshops

Online Surveys

Public Hearings

Postal Mail

  • 9/12/2025: Gibbons/High/Fernside public outreach postcards (1,256 addresses)
  • 10/21/2024: Gibbons/High/Fernside Pop-Up flyer (148 addresses)

Email Bulletin Mailings

  • 4 mailings sent starting September 2025 (plus earlier mailings sent as part of the Fernside Project)

Gibbons/High/Fernside Traffic Study, Draft Recommendations

Fernside Project Design Concepts (March 2025)

More on the project webpage